4 on 4 off shift pattern: the rota, the hours and the rules for 12-hour shifts
Four 12-hour shifts, then four days off. The 4-on-4-off pattern covers a post 24/7 with four crews and averages 42 hours a week, but its 8-day cycle never lines up with the calendar. Here is the rota, the hours week by week, the days-then-nights variant, how it compares with 4-on-2-off and 2-on-4-off, and the rules it must pass.
In short
- 4 on 4 off is an 8-day cycle: four 12-hour shifts, then four days off. Four crews — two on days, two on nights — cover a post 24/7.
- Each person averages 42 hours a week — 182.5 shifts and about 2,190 hours a year — in weeks of 48 and 36 hours: four of each over the 8 weeks it takes the cycle to come round to the same weekday.
- The days off move one weekday later every cycle, so there are no fixed days off; over 8 weeks a crew has 3 full weekends off. The 2 days, 2 nights, 4 off variant keeps nights to two in a row.
01
How 4-on-4-off works
Each crew works four consecutive 12-hour shifts and then has four days off: an 8-day cycle. A second crew works the four days the first has off, so the two of them cover one shift every day. Two crews on days and two on nights give round-the-clock cover.
- Shifts per person: 4 in every 8 days — an average of 3.5 a week, 42 hours.
- Over a year: 182.5 shifts, about 2,190 hours.
- Because the cycle is 8 days, the working days move one weekday later every cycle. There are no fixed days off.
- The pattern and the calendar line up again every 56 days (8 weeks). In those 8 weeks a crew has 3 full weekends off.
| Crew | Mon | Tue | Wed | Thu | Fri | Sat | Sun | Mon | Tue | Wed | Thu | Fri | Sat | Sun | Mon | Tue |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A | D | D | D | D | – | – | – | – | D | D | D | D | – | – | – | – |
| B | – | – | – | – | D | D | D | D | – | – | – | – | D | D | D | D |
| C | N | N | N | N | – | – | – | – | N | N | N | N | – | – | – | – |
| D | – | – | – | – | N | N | N | N | – | – | – | – | N | N | N | N |
Crew A’s block starts on Monday in the first cycle and on Tuesday in the second: every cycle moves the working days one weekday later.
02
Hours week by week
Any 7 days of the cycle contain either 3 or 4 shifts, so a Monday-to-Sunday week is 36 or 48 hours. Over the 8 weeks it takes the pattern to come round to the same weekday, a crew has 4 weeks of 48 hours and 4 of 36.
| Week | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | Average |
|---|---|---|---|---|---|---|---|---|---|
| Hours | 48 | 48 | 48 | 48 | 36 | 36 | 36 | 36 | 42 |
Computed from the cycle. Which weeks are long depends on the start day; the four-and-four split does not.
03
The days-then-nights variant: 2 days, 2 nights, 4 off
Instead of fixed day and night crews, every crew works two day shifts (07:00–19:00), then two night shifts (19:00–07:00), then has four days off. The cycle is still 8 days and still averages 42 hours; four crews, each starting two days after the previous one, cover 24/7.
- Nights in a row: 2 instead of 4.
- Day to night: the second day shift ends at 19:00 and the first night starts 24 hours later.
- After the nights, four full days off to recover.
- The UK Health and Safety Executive suggests allowing two nights of full sleep when switching from days to nights; this variant allows one.
04
4-on-2-off and 2-on-4-off compared
- 4-on-2-off: a 6-day cycle, an average of 4.67 shifts a week. On 8-hour shifts that is about 37.3 hours a week; on 12-hour shifts it is 56 — above the 48-hour average allowed in the EU (Directive 2003/88/EC, article 6) and in Great Britain only for workers who have agreed in writing to work more (Working Time Regulations 1998, regulation 4).
- 2-on-4-off: 2.33 shifts a week, 28 hours on 12-hour shifts — a part-time pattern. Covering one 12-hour shift every day needs three people on it.
- 4-on-4-off and 2-2-3 both average 42 hours on 12-hour shifts; 2-2-3 keeps the same weekdays every fortnight and never puts more than 3 shifts in a row.
05
The rules for 12-hour shifts
- Daily rest: at least 11 consecutive hours in every 24 (Directive 2003/88/EC, article 3; Working Time Regulations 1998, regulation 10). Twelve hours off between two 12-hour shifts passes.
- Average week: no more than 48 hours over a reference period of up to four months in the EU (articles 6 and 16), 17 weeks in Great Britain (regulation 4). 4-on-4-off averages 42.
- Breaks: a rest break when the working day is longer than six hours (Directive, article 4); in Great Britain at least 20 uninterrupted minutes (regulation 12).
- Night workers: normal hours must not exceed an average of 8 in every 24 (Directive, article 8; regulation 6). A night crew on 4-on-4-off works 336 hours in 56 days; leaving out the 8 weekly rest days, as the rules require, that is an average of 7 in 24.
- Hazardous or heavy night work: no more than 8 hours in any 24-hour period with night work (Directive, article 8(b); regulation 6(7)) — 12-hour nights are not allowed for it.
- The HSE suggests limiting long shifts and night shifts to 2–3 in a row and shifts to 12 hours including overtime. Four 12-hour shifts in a row go beyond that advice; the days-then-nights variant stays within it.
06
In Greece
Working hours may not exceed 8 a day and 48 a week (Labour Code, article 187). Longer shifts are allowed only where the work, by its nature, must run continuously with crews relieving each other, with an average of no more than 48 hours a week; the order of the crews must change every week so that the crew on nights one week works days the next, and anyone who works a Sunday gets 24 hours of rest on another day of that week (article 201).
07
Over a year: shifts, hours, weekends
| Per 8 days | Per 56 days | Per year (365 days) | |
|---|---|---|---|
| Shifts | 4 | 28 | 182.5 |
| Hours | 48 | 336 | 2,190 |
| Average hours a week | 42 | 42 | 42 |
| Longest run of shifts | 4 | 4 | 4 |
| Full weekends off (Saturday and Sunday) | — | 3 of 8 | about 20 of 52 |
| Weekends with at least one shift | — | 5 of 8 | about 32 of 52 |
Before leave, sickness and training. Because the cycle is 8 days, the weekend count is only exact over 56-day blocks.
08
How many people the pattern needs
A post covered 24 hours a day, every day, is 168 hours a week; at 42 hours per person that is four people per post — two crews on days, two on nights — before anyone is on leave or off sick. The variant with 2 days, 2 nights and 4 off needs the same four crews, each starting two days after the previous one, and covers the post in the same way.
| Crew | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 |
|---|---|---|---|---|---|---|---|---|
| A | D | D | N | N | – | – | – | – |
| B | – | – | D | D | N | N | – | – |
| C | – | – | – | – | D | D | N | N |
| D | N | N | – | – | – | – | D | D |
Every day has one crew on days and one on nights. Each crew’s second day shift ends at 19:00 and its first night starts 24 hours later.
09
A free workbook with 4 on 4 off and five more patterns
One sheet per pattern — 4 on 4 off, the days-then-nights variant, 2-2-3, DuPont, Continental 2-2-2-2 and the three-shift five-day rotation. Type a start date and the sheet fills eight weeks for every crew and counts the hours of each Monday-to-Sunday week; each pattern is an editable string of letters.
Download the shift-pattern workbook.xlsx · 32 KB10
Setting it up in 365shift
- 365shift has no 4-on-4-off generator, and because the cycle is 8 days a one-week template will not repeat it. Build the 8 weeks in which the cycle and the calendar line up, then copy that range (custom view) and paste it, with or without the same people.
- The minimum-rest rule (11 hours by default) warns on any shift that leaves less rest than that.
- The maximum-weekly-hours rule counts Monday to Sunday and blocks shifts above the cap; on this pattern a week can reach 48 hours.
Frequently asked questions
How many hours a week is 4 on 4 off?
An average of 42 on 12-hour shifts: 4 shifts every 8 days. Any Monday-to-Sunday week has 3 or 4 shifts, so 36 or 48 hours.
How many crews does a 4-on-4-off pattern need for 24/7?
Four: two on days and two on nights, each pair alternating four days on and four off.
What is the difference between 4 on 4 off and 2-2-3?
Both average 42 hours on 12-hour shifts with four crews. 4-on-4-off has 4 shifts in a row and days off that move round the week; 2-2-3 has at most 3 in a row and repeats on the same weekdays every 14 days.
Is 4 on 2 off legal with 12-hour shifts?
It averages 56 hours a week, above the 48-hour average in the EU (Directive 2003/88/EC, article 6). In Great Britain it is possible only for workers who have agreed in writing to work more than 48 hours (Working Time Regulations 1998, regulation 4).
How many hours a year is 4 on 4 off on 12-hour shifts?
About 2,190: 182.5 shifts of 12 hours, before leave and sickness. Over 56 days it is exactly 336 hours in 28 shifts.
How many weekends do you work on 4 on 4 off?
Over the 8 weeks it takes the cycle to come round, a crew has 3 full weekends off and works at least one day of the other 5. Over a year that is about 20 full weekends off.
How many days do you work on 4 on 4 off?
Half of them: 4 in every 8, 182.5 a year. With 12-hour shifts that is an average of 42 hours a week.
Is 4 on 4 off legal in the UK?
The Working Time Regulations 1998 cap the average week at 48 hours over 17 weeks unless the worker opts out in writing (regulation 4); 4 on 4 off averages 42. Each shift still needs a 20-minute break (regulation 12), and 12-hour nights are not allowed for work with special hazards or heavy strain (regulation 6(7)).
Does 4 on 4 off have fixed days off?
No. The 8-day cycle moves the working block one weekday later every cycle, so days off rotate through the week and the pattern lines up with the calendar again every 56 days.
Shift rosters and the Digital Work Card in one system
365shift builds the roster against your rules, declares it to ΕΡΓΑΝΗ as the working-time organisation and files the work card from employees’ mobile clock-ins.
Sources
The legal references in this guide rely on the official texts below. It is not legal advice; for your case, ask your accountant or lawyer.
- Directive 2003/88/EC concerning the organisation of working time (EUR-Lex)
- Working Time Regulations 1998 (Great Britain), regulations 2, 4–6, 9–13A and 15B
- UK Health and Safety Executive — Good practice guidelines for shift design
- Fair Labor Standards Act, 29 U.S.C. § 207(a)(1) — overtime after 40 hours in a workweek
- 29 CFR § 778.104 — each workweek stands alone
- Fair Labor Standards Act, 29 U.S.C. § 218(a) — stricter federal, state and local laws still apply
- Greek Labour Code, article 187 — maximum daily hours (Greek)
- Greek Labour Code, article 201 — continuous operations with successive crews (Greek)